Here is the latest construction update including blocked slips:

  • Slips 1-3 – Accessible by 5 May,  Currently blocked by construction barge
  • Slips 20-44 – Accessible 5 May,  Currently blocked by construction at lighthouse

The back dock (slips 90-122) is accessible and will remain so.  After the lighthouse area is done, the crew will move to the back to replace the walk out.  This will be done in short sections and access will be provided during the construction.

 